Stage 8: Sunday, May 23, 2010 - TO/Westlake/Agoura Hills, 134.3km

The Tour's final day, stage 8, will give the riders' tired legs another final test. The 21-mile (33km) circuit contains the Mulholland Highway climb, which takes the peloton up 1,000 feet.

The course, to be ridden a total of four times, will start at "The Oaks" shopping mall and covering 4.8 miles (7.6km) on a neutralised section before starting on the circuit. The peloton will turn on to the Mulholland Highway about a third of the way into the course, and there they will face steep climbs and numerous switchbacks.

Latest on Cyclingnews